Fuselage Tipped the Canoe

Here the fuse is tipped and aligned with me very happy, practicing the RV grin so long.

 

This is just before the fuse was tipped all the side skin riveting completed, but still upside down

 

A view of the 'bottom' as smooth as can be...

 

The Fuse turned right side up

 

The fuse lowered onto the platform.

 

The insides

 

The Firewall and support angles.

 

More of the insides

 

 

The Fuselage being leveled out 0.0 degrees all around.

 

Having a bit of fun with the little inspector, while I fitted the control columns mounts back into place, see next picture.

 

The control column mounts back in place bolted to the center section.

  

Match drilling the rear horisontal stab deck, the firewall top reinforcement gusset, and the canopy latch decks.

  

 

The seat belt shoulder cable anchors, and the bulkhead to longerons reinforcement brackets closeups and relative position in the fuselage.